Walk the raw floor
We stand on the slab before fit-out: columns, the core, the glazing line, ceiling height, and where the risers actually land.
On site · 1–2 h
K-4 · raw floor
AX-02 / before finishing
Before you sign for a floor, we stand on the raw slab, measure it to the 1.2 metre grid, and cut it on paper. You get the lettable area — the desks it really holds — not the number printed on the lease.
A floor read takes about a week. We never scale it off a landlord's PDF — we walk it, measure it, and draw it against the real grid.
We stand on the slab before fit-out: columns, the core, the glazing line, ceiling height, and where the risers actually land.
On site · 1–2 hMert sets out the 1.2 m planning module off the facade mullions and reconciles it against the landlord's drawing, line by line.
Survey · tolerance ±2 cmLifts, stairs, shafts and the wet core are drawn and subtracted. This is the area you pay rent on but can never let.
Drawing · gross vs lettableDeniz slices the floor into offices, meeting rooms and open benches — cellular and open side by side, so you can compare desks, not adjectives.
Two layouts · same floorOne honest number: usable m², the desk count, and the efficiency ratio against the gross floor on your lease.
Signed statement + PDFEce sits with you and the landlord, marks the walls that can move, and tells you what each move costs before anyone signs.
With landlord · on site
Every floor has an area you pay for and can’t use: the lift core, the stair, the shafts, the wet areas, and the corridor that reaches the far offices. Lettable area is what’s left once those are drawn and removed.
If a broker quotes you desks off the gross number, the floor is already oversold. We always state lettable.
Before you fall for a layout, we mark what’s structural and what’s partition. The facade and the core are fixed. Everything else can move, on the grid, with a lead time we can give you on the spot.
| Wall type | Moves? | Lead time |
|---|---|---|
| Glazed partition | Yes | 3–5 days |
| Plasterboard stud | Yes | 2–3 days |
| Core / structural | No | — |
| Facade mullion (1.2 m) | Fixed grid | — |
Lead times confirmed after the floor read. Structural changes are referred to the building’s own engineer.
Set your headcount and the way you want to work. We size the lettable area, the gross floor you’d lease, the desks, and the 1.2 m planning modules the layout sits on.
Sample sizing on the Plateline norm — 8 m² per person open plan, 11.5 m² cellular, 82% floor efficiency. Lettable area is always smaller than the floor you lease. Every real floor is confirmed on site.
This is how a read floor leaves the studio: a schedule of rooms with codes, measured area, seats, and current occupancy. Colour carries meaning here — it isn’t decoration.
24 m² · 2 desks
21 m² · 6 seats
16 m² · 1 desk
96 m² · 12 desks
3 m² · 1 seat
| Code | Room | Area | Seats | Status |
|---|---|---|---|---|
| K-7.01 | Corner office | 24 m² | 2 | Let |
| K-7.02 | Office | 16 m² | 1 | Available |
| K-7.03 | Meeting room (6) | 21 m² | 6 | Held |
| K-7.04 | Open bench | 96 m² | 12 | Available |
| K-7.05 | Phone booth | 3 m² | 1 | Let |
| K-7.06 | Focus room | 11 m² | 2 | Available |
| — | Lettable total | 171 m² | 24 |
We don’t book floors, we don’t take a cut from the building, and we don’t round numbers up to make a floor look better than it is.
We take no fee from the building — independent of landlords since 2016.
A floor read is handed between the same three people every time — so nothing is scaled off a PDF by someone who never stood on the slab.

Planning lead & founder
Interior architect, İTÜ, 2011. Spent five years cutting floors for a Levent fit-out contractor before starting Plateline in 2016. Deniz draws every plan and signs every lettable statement — the layouts are hers.

Surveyor
Geomatics engineer and the one on the slab with the disto. Mert sets the grid off the mullions and has caught risers drawn two metres out of place on more than one landlord’s plan. If a number is on our schedule, he measured it.

Client liaison
Nine years between tenants and landlords in Beşiktaş. Ece runs the walk-through, translates the plan into desks and move costs, and makes sure the building hears which walls you need before you sign.
No price list, no online booking, no account — every floor is scoped after the first visit and availability is answered by e-mail. The lease stays between you and the building.
1 floor · scoped on site
2 layouts · same floor
4 floors · one stack
Every floor is scoped after the first visit — area, access and the condition of the slab shape the work. We take on six to eight reads a month; the current wait is about two weeks. Ask about availability by e-mail.
“Plateline told us the 11th floor we loved was 74% efficient and the one upstairs was 81% — same rent. We took the upstairs and fit nine more desks on the identical team.”
“They caught a riser the landlord’s PDF had drawn two metres off. That riser would have sat in the middle of our main meeting room.”
“Ece sat with our landlord and marked exactly which glazed walls we could move and what each metre cost. We walked onto site with no surprises.”
No. We read and draw the floor; you and the landlord sign the lease. We stay independent of the building and take no fee from it, which is the only way our lettable numbers can be trusted.
It is the floor area you can actually put desks and rooms on, once the lift core, stairs, shafts, wet areas and the primary corridor are measured and removed. The gross floor on your lease is always larger — usually by 18 to 26 percent.
About a week from the first visit. Measuring is one morning; drawing the core and cutting the layouts is three to five days; then we walk it back with you. A stack of several floors in one building takes a little longer.
On site, every time, to a tolerance of about two centimetres. We reconcile our survey against the landlord’s drawing and flag any difference — the drawing is a starting point, not the truth.
Yes. We mark structural walls, the core and the facade as fixed, and partition walls as movable, each with a sample cost per metre and a lead time. Anything structural is referred to the building’s own engineer before you plan around it.
It is the planning grid most Levent towers are built on — facade mullions, ceiling tiles and glazing all sit at 1.2 m. Laying your desks and rooms on the same grid keeps fit-out simple and cheap; ignoring it is where budgets slip.
Levent and Beşiktaş are where we work most, so we know the stock and the landlords. We read floors in Maslak and Şişli on request — ask us and we’ll tell you honestly whether we’re the right studio for that building.
A PDF floor plan drawn to the grid, a signed lettable-area statement, the desk count for each layout, and — on a read-plus-cut — the cellular and open options side by side with wall-move notes.
Send the building, the floor, and roughly how many people you’re planning for. We’ll reply within one working day and book the first visit.
The request form lives on the contact page: name, email, the building and floor, and a line about how many people you’re planning for. It takes under a minute and we reply within one working day.